Completed projects
-
Baillieu Library (ground floor)
Ground floor north and south study spaces now completed and open.
-
Giblin Eunson Library
The Library was successful in getting the space previously occupied by the Commerce Student Centre and created an additional 268 seats, but 18 seats are allocated to the Faculty of Business and Economics for the FBE Research Database Unit.
-
Law Library
The service desk and the High Use Collection was moved out into the lobby area to be more visible and more accessible to students.
-
Brownless Biomedical library
The library component has been completed and the Museum piece with additional display cases to be in the library space should be completed by 31 July, 2017.
-
ERC
The carpet is being replaced on levels 4 and 5 of the ERC through June and July 2017.
-
Baillieu library (Level 2)
A redevelopment of Level 2 of the Baillieu has recently been completed in order to upgrade and significantly improve the amenity of this space for students.
-
Southbank Library
The Southbank Library redevelopment project was completed in March 2019, part of a major transformation of the Southbank campus.
-
Veterinary Science Library Werribee
The new Veterinary Science Library is now open within the Learning and Teaching building, completed as part of a major redevelopment project at the Werribee campus.